A work order template is a ready-made form for one maintenance job: which asset, what's wrong, who's doing it, what they found and did, the parts and hours used, and how long the machine was down. Download our free maintenance work order template in Excel or as a printable PDF. It includes a maintenance request form, a work order register and three filled plant examples. No sign-up.
Maintenance work order template (Excel)
Blank work order, three filled examples (breakdown, preventive, planned corrective), a maintenance request form, a work order register and editable dropdown lists. Works in Excel and Google Sheets.
Maintenance work order template (printable PDF)
Two pages for the clipboard: a one-page blank work order and a maintenance request form. US Letter, portrait.
If you want the bigger picture first (work order types, statuses, how jobs move from raised to closed), start with our guide to work order management. This page is about the form itself.
What's in the template
Most free work order templates are built for contractors: a customer name, a price, payment terms and a signature from the client. That's a job ticket for billing. A plant maintenance team needs a different form, because the work order is also the record you'll count later.
The Excel file has eight tabs:
- How to use: ten short notes on filling it in.
- Work order (blank): the one-page form. Copy the tab for each new job, or print it.
- Three filled examples: a breakdown, a preventive job and a planned corrective repair. They're described further down this page.
- Maintenance request (blank): a short form for operators and anyone else to report a problem.
- Work order register: one row per work order, so you can see what's open at a glance.
- Lists: the work types, priorities, statuses, permit types and problem codes the dropdowns read from. Edit them to match your site.
The PDF has the blank work order on page one and the request form on page two.
The fields, and why each one is there
Every field on the form is there because of something you'll want to know later. If a field doesn't feed a decision, it doesn't need to be on the form.
| Field | What to write | What it gives you later |
|---|---|---|
| Work order number | A unique number, in sequence | One reference that ties the parts, hours and any follow-up jobs together |
| Date / time raised | When the job was reported | How long jobs wait before anyone starts |
| Requested by | The person or shift who reported it | Who to tell when it's fixed |
| Asset ID and location | The machine's tag number and where it is | The asset's history. MTBF only works if failures are counted against the right machine |
| Work type | Preventive, corrective, breakdown, inspection or safety | The split between planned and unplanned work (planned maintenance percentage), and PM compliance |
| Priority | P1 to P4 | What gets done first. The Lists tab has plain definitions as a starting point; set your own response times |
| Problem as reported | The symptom, in the requester's words | What was actually seen or heard, before anyone diagnosed it |
| Problem code | One code from a short list | Repeat failures you can count. Free text can't be counted |
| Machine stopped? / stop time / back in production / downtime type | Yes or no, two times, and planned or unplanned | Downtime per machine and MTTR |
| Lockout required? / permit / JSA reference | Yes or no, the permit type, the JSA number | A safety check on the form that sends someone into the machine. See lockout/tagout, permit to work, and our JSA template |
| Plan: assigned to, trade, estimated hours, parts needed, special tools | Filled before the job starts | A job someone can start without three trips to the store. That's the idea behind planned maintenance, and the job a maintenance planner does |
| Actuals: labour hours, parts used, work done | Hours per person, part numbers and quantities, what was done | What the job really took, compared with the plan |
| Cause as found | What failed, and why, as far as the technician can tell | The start of any root cause work, and the reason the same failure doesn't get fixed three times |
| Follow-up needed / follow-up WO number | Yes or no, and the new job's number | A finding that becomes a job instead of a note |
| Close-out: sign-off, accepted by, status | Technician and supervisor or requester, with dates | A job that's actually closed, not just finished |
A few fields deserve a closer look.
Problem codes. Keep the list short, 10 to 20 codes, and use plain words. The template starts you with twelve: bearing seized, belt broken or slipping, leaks, overheating, abnormal noise or vibration, electrical faults, sensor or switch faults, damaged guards, misalignment, missing lubrication, wear, and other. If "other" turns into the most common code, add the codes people keep writing in. Plants that want a fuller structure often borrow from ISO 14224, the standard for collecting reliability and maintenance data. It was written for the petroleum, petrochemical and natural gas industries, but its approach to failure modes travels well. Most plants don't need its full depth on day one.
The safety block. Not one of the popular free templates we looked at asks whether lockout is needed, on a document that sends someone to open up a machine. It's one line, and it makes the question hard to skip. The permit field does the same for a hot work permit or a confined space permit. Under OSHA 29 CFR 1910.147, servicing work where a machine could start up or release stored energy needs energy control, so the work order is a sensible place to ask.
Downtime type. A machine that's stopped for a planned service inside a scheduled window isn't a breakdown. Mark it planned, and it stays out of your breakdown numbers.
Labour hours vs downtime hours
This is the most common mistake on paper work orders. A form that only asks for "time spent" blurs two different numbers.
Take a conveyor that stops at 06:40 and is back in production at 09:55. That's 3.25 hours of downtime. Two technicians worked on it for 2.5 hours each: 5.0 labour hours. The rest of the downtime was the call-out, getting the bearing from stores and the test run.
The two numbers answer different questions:
- Downtime is what production lost. It feeds MTTR: the elapsed time from the machine stopping to being back in production, averaged over breakdowns. You can work yours out with the MTTR calculator or the downtime percentage calculator.
- Labour hours are what maintenance spent. They tell you about workload and staffing, and whether the job plan's estimate was any good.
If you only record one, you can't tell a slow repair from a big crew, or a quick fix from a long wait for parts. The template asks for both and calculates the totals itself.
Example 1: a breakdown work order (seized conveyor bearing)
Illustrative example, not a record from a real plant. It's filled in on the "Example - breakdown" tab of the Excel file.
| Field | Entry |
|---|---|
| Work order / priority / type | WO-0142, P1, breakdown |
| Asset | CV-203, packing line 2 outfeed conveyor, head pulley drive |
| Problem as reported | Conveyor stopped mid-shift. Loud grinding from the head end for a few minutes before it stopped, then a burning smell |
| Problem code | Bearing seized |
| Safety | Lockout: yes. Permit: none |
| Downtime | Stopped 06:40, back in production 09:55: 3.25 hours, unplanned |
| Labour | Two mechanical technicians, 2.5 hours each: 5.0 hours |
| Parts used | One pillow block bearing (50 mm bore), one grease cartridge |
| Work done | Locked out, released belt tension, replaced the drive-side bearing, re-tensioned and tracked the belt, greased the other side, test-ran 15 minutes |
| Cause as found | The grease line to the drive-side bearing was blocked where it kinks behind the guard, so the bearing ran dry |
| Follow-up | Yes, WO-0143: clear and re-route the grease line, and add "grease reaches both head pulley bearings" to the weekly PM checklist |
This is a classic breakdown maintenance job. The cause as found is what makes the work order worth more than the repair. Without it, the next bearing goes in, the grease line stays blocked, and the same failure comes back.
Example 2: a preventive work order (air compressor monthly service)
Illustrative example. On the "Example - preventive" tab.
| Field | Entry |
|---|---|
| Work order / priority / type | WO-0150, P3, preventive. Raised automatically by the monthly PM plan |
| Asset | AC-02, rotary screw air compressor No. 2 |
| Problem as reported | Monthly PM due. Follow the AC-02 monthly checklist (revision 3) |
| Safety | Lockout: yes. Permit: none |
| Downtime | Stopped 08:00, back 09:30: 1.5 hours, planned. The standby compressor carried the load, so the plant kept its air |
| Labour | One technician, 1.75 hours |
| Parts used | One intake filter element (the restriction indicator was in the red) |
| Work done | Started the standby compressor, isolated and blew down AC-02, checked oil, belt and hoses, replaced the intake filter, drained the receiver by hand, recorded temperature and pressure on the checklist |
| Cause as found | No failure. Finding: the receiver's automatic condensate drain valve is sticking |
| Follow-up | Yes, WO-0151: a corrective job to clean or replace the drain valve |
Two things to notice. The machine was stopped, but the downtime is marked planned, so it doesn't count against the compressor as a breakdown. And the PM found a problem, which became its own work order. That's a preventive maintenance checklist doing its job.
Example 3: a planned corrective work order (press cylinder seal)
Illustrative example. On the "Example - planned corrective" tab.
| Field | Entry |
|---|---|
| Work order / priority / type | WO-0148, P3, corrective. Raised by a technician on the weekly PM route |
| Asset | PR-05, 200-ton hydraulic press, main cylinder |
| Problem as reported | Oil weeping at the main cylinder rod seal. A small drip on the bolster each shift, no loss of pressure yet |
| Problem code | Leak (oil, air, hydraulic) |
| Plan | Two technicians, 4 hours estimated, rod seal kit and 20 L of oil kitted during the week |
| Downtime | Saturday's planned stop, 07:00 to 11:30: 4.5 hours, planned |
| Labour | Two technicians, 4.0 hours each: 8.0 hours |
| Work done | Lowered the ram onto support blocks, isolated and bled down the hydraulics, replaced the rod seal, wiper and guide ring, topped up oil, test-cycled 20 strokes |
| Cause as found | Seal hardened and worn. Light scoring on the rod, polished out and within limits. No record of when the seal was last changed |
| Follow-up | Yes, WO-0158: record the seal change on the press's history and add a rod check to the quarterly PM |
This is the job most templates have no box for: corrective maintenance that was found early, planned and done in a scheduled stop. It's corrective work, and it's planned work. The work type and downtime type fields together let you count it correctly.
Work request vs work order
A work request says something's wrong. Anyone can raise one: an operator, a supervisor, someone from quality walking past. A work order authorizes a job. Maintenance has looked at the request, accepted it, planned it and assigned it to someone.
Not every request becomes a work order:
- Duplicates get merged into the job that's already open. Three operators reporting the same noisy fan shouldn't create three jobs.
- Some get declined: the machine is due for replacement, or it isn't a maintenance job.
- Some become a change to a PM plan instead of a one-off job.
The request form in the template has two halves. The top half is for whoever spotted the problem: who's reporting it, when, where, the asset if they know it, what they saw or heard, whether the machine has stopped, whether anyone's at risk, and whether they took a photo. The bottom half is for maintenance: accepted, merged or declined, the work order number, and why if it wasn't accepted.
One honest note: if you search for a "maintenance request form," most of what you'll find is for tenants and buildings. Ours is written for a plant floor.
How to roll it out on the floor
A template only helps if people use it the same way. Five steps:
- Agree the problem codes first. Sit down with the technicians and edit the Lists tab together. Codes they didn't help choose won't get used.
- Put request forms where problems get noticed. At the line, in the control room, wherever operators already report problems. Make it easier than walking to find someone.
- Have one person review requests every day. Accept, merge or decline, and give accepted requests a work order number. If nobody owns this, requests pile up.
- Close out within the shift. Fill in the downtime, labour and cause as found while they're fresh. A work order completed from memory the next morning has guessed times in it.
- Review the register weekly. Look at what's still open and why, close anything that's done, and look for problem codes that keep coming back.
Where a spreadsheet work order stops working
A spreadsheet or paper work order is a fine place to start. It runs into the same limits most plants hit:
- Nobody enforces the fields. Downtime and cause as found are the first to be skipped when the shift is busy, and they're the ones you need most.
- Paper gets lost between the floor and the office, or sits in a tray for a week.
- You can't count across the pile. Problem codes help, but pulling MTTR per machine out of 400 rows still means someone building a pivot table every month.
- The register and the forms drift apart. Someone closes the form and forgets the register, or the other way round.
Our equipment maintenance log template covers the same limits for asset history logs, and if downtime is the main thing you need to track, the downtime tracking guide has a separate downtime log spreadsheet. If you're weighing up whether it's time to move on from spreadsheets, our guide to what a CMMS is explains what it replaces.
Where a CMMS helps
In MachDatum CMMS, the fields on this template become the work order itself:
- Each work order type gets its own form. Screens and custom fields are set per type, so a breakdown job and a PM job can ask for different things.
- Required fields at each step. A job can be set so it can't move forward without the data: root cause when the repair starts, downtime hours when it closes. The fields paper lets you skip become fields you can't skip.
- Dropdowns from your own lists. Failure modes and other reference lists are set up once and used everywhere.
- PM work orders create themselves. A preventive maintenance plan generates and assigns the work order on its due date, with the checklist already attached and the asset linked.
- On the floor. Technicians open and close jobs on the mobile app, add photos, scan an asset's QR tag to see its history or raise a job, and sign off on site.
- Overdue jobs escalate. Escalation rules per work order type pull in a supervisor or manager when a job runs late.
- Paper when you want it. Any work order exports to PDF.
- Reports without a pivot table. MTBF, MTTR and downtime by asset come from closed work orders, with no separate entry.
Parts used are recorded on the work order, the same as on the paper form. We're onboarding our first group of manufacturing teams right now. If your work orders live in a spreadsheet or a tray on someone's desk, see how MachDatum CMMS handles them.