Plant-wide visibility

See your plant the way it runs.

Every machine, job and PM, laid out by location.

PRESS SHOPMACHINE SHOPASSEMBLY LINE 2UTILITIESSTORESHP-04 · Seal leakWO-031 · In Progress · Adam M.CNC-06 · Spindle checkPM due tomorrowCMP-01 · Replace V-beltOverdue 2 daysMTR-14 · New motorAdded from a nameplate photo
  • Running
  • Work order open
  • Overdue
  • PM due
  • New asset

The plant, live

Your whole plant on one screen

Pick a location and its numbers open beside it.

Plant Overview

Every asset by location, with its open work and the PM that's due

LiveWed 30 Sep · 10:05

Assets

20

Across 5 areas

Open work orders

5

Open or in progress

Overdue

1

Past due date

PM due

3

This week

PM compliance

97%

On time, this month

MTTR

3.8 h

Last 90 days

3 locations in Acme Plant

Building

Production HallPH-01

Acme Plant › Production Hall · 14 assets

5 need attention

MTBF

27 d

Between failures

MTTR

3.4 h

To repair

Downtime

9h 30m

Last 30 days

Open WOs

4

0 overdue

PM compliance

100%

Target 90%

PM compliance

This month · on time, due and overdue

On time24
Due1
Overdue0

1 PM due this month, none overdue.

Work orders by priority

Last 90 days

Critical
1
High
3
Medium
9
Low
6

4 of 19 were critical or high.

Open work orders · 4

  • WO-026 · Calibrate pressure gaugeHP-02 · Hydraulic Press 160TIn Progress
  • WO-031 · Seal leak, oil on floorHP-04 · Hydraulic Press 250TIn Progress
  • WO-030 · Monthly lubricationCNV-02 · Belt Conveyor, Line 2In Progress
  • WO-025 · Noise from gearboxGBX-03 · Gearbox, Assembly LineOpen

Status

  • Running9
  • Work order open4
  • Overdue0
  • PM due1
  • New asset0

1/9 Plant KPIs

Location hierarchy

Organise the plant the way it's built

  • Sites, buildings, areas and lines in one tree, with your own location types
  • Every location lists its assets and its open work orders
  • Move a location with everything under it, and set who can work there

Location Hierarchy

Locations are the physical places where assets are installed — buildings, floors, or zones. Use the tree to organise locations into a hierarchy and assign assets to specific spots.

Press ShopActive

Area • PS-01 • Level 3

Child Locations

No child locations yet

Recent Assets

5
Hydraulic Press 160THydraulic PressHP-01
Hydraulic Press 160THydraulic PressHP-02
Hydraulic Press 250THydraulic PressHP-03
Hydraulic Press 250THydraulic PressHP-04
Hydraulic Press 160THydraulic PressHP-05

Recent Work Orders

2
Calibrate pressure gaugeWO-026 · HP-02In Progress
Seal leak, oil on floorWO-031 · HP-04In Progress

1/6 Search

Frequently asked questions

Seeing every asset, its open work and its next PM across the whole plant in one place, organised the way the plant is built: site, building, area and line.

Get started

See your whole plant in MachDatum CMMS

30 minutes, your own equipment, no obligation.