PMP Calculator — Planned Maintenance Percentage
Enter planned and total maintenance hours to see how much of your maintenance is planned, instantly.
PMP = Planned maintenance hours ÷ Total maintenance hours × 100
Your numbers
PMP
Share of maintenance time that was planned
340 ÷ 400 × 100 = 85%
How the calculation works
PMP = planned maintenance hours ÷ total maintenance hours × 100. It’s the share of maintenance time spent on planned work rather than reacting to breakdowns. Higher PMP is better.
Planned work includes preventive, scheduled and condition-based jobs, plus corrective repairs planned ahead of time; the rest is unplanned, mostly breakdown repair. Our planned maintenance guide explains where the line sits. Some teams count work orders instead of hours, but hours give a truer picture because one long breakdown can outweigh many short planned jobs.
Planned work is faster and safer: parts are kitted, the procedure is ready and the right person is assigned. A rising PMP usually comes with a falling MTTR.
This calculator is for one period, entered by hand. In MachDatum CMMS, work order types separate breakdown repairs from planned PM work, so the split is already recorded.
Related calculators
Frequently asked questions
PMP is the share of total maintenance time spent on planned work (preventive, scheduled, condition-based and planned corrective) rather than reactive breakdown repairs. It shows how much of your maintenance is under control versus firefighting.
PMP = Planned maintenance hours ÷ Total maintenance hours × 100. If the team logged 400 maintenance hours and 340 were planned work, PMP is 85%.
Yes. Some teams use planned work orders ÷ total work orders. Hours give a truer picture because one long breakdown can take more time than many short planned jobs. Pick one method and stick with it so the trend is comparable.
Planned work is faster and safer than reactive work: parts are kitted, the procedure is ready and the right technician is assigned. A rising PMP usually comes with lower MTTR and fewer surprise breakdowns.