Uptime and downtime

Machine Availability Calculator

Enter planned production time and downtime to get machine or equipment availability — the first factor in OEE.

Availability = (Planned time − Downtime) ÷ Planned time × 100

Your numbers

hours
Scheduled run time, excluding holidays and unscheduled shifts.
hours
Breakdowns, changeovers and setups within scheduled time.

Availability

91.7%

Share of planned time the machine actually ran

Running time440 hours
Downtime40 hours

(480 − 40) ÷ 480 = 91.7%

How the calculation works

Availability = (planned time − downtime) ÷ planned time × 100. It’s the share of planned production time a machine actually ran. Higher availability is better.

Planned time leaves out hours you never meant to run, like holidays or shifts with no orders. Downtime includes breakdowns, changeovers and setups inside those hours.

There’s a second route to the same number: availability = MTBF ÷ (MTBF + MTTR), the standard reliability-engineering definition. Use whichever figures you already have. Availability is also the first factor in OEE.

This calculator is for one machine over one period, entered by hand. MachDatum CMMS tracks downtime per asset from breakdown work orders, so the downtime figure is already on record.

Frequently asked questions

Availability is the fraction of planned production time a machine was actually running. It is calculated as running time divided by planned production time, and is one of the three components of OEE (alongside Performance and Quality).